We offer consultancy services on the entire formulation of the EPDM line. We provide consultancy services in raw material supply along with turnkey and post-installation technical support.
EPDM-1
Turnkey facility installation that provides production with a capacity of 2.5 tons in 8 hours can be achieved by working with 5 people.
EPDM-2
Turnkey facility installation that provides production with a capacity of 4 tons in 8 hours can be achieved by working with 2 people.
EPDM-3
Turnkey facility installation that provides production with a capacity of 7.5 tons in 8 hours can be achieved by working with 2 people.
Tire Recycling Line
We provide consultancy services in raw material supply as well as turnkey and post-installation technical support regarding the tire recycling line.
LINE-1
A turnkey facility can be installed with a capacity of 500 kg in 1 hour by working with 3 people.
LINE-2
A turnkey facility can be installed with a capacity of 750 kg in 1 hour by working with 3 people.
LINE-3
Turnkey facility installation that produces 1 ton capacity in 1 hour can be achieved by working with 3 people.